SOLUTION OF WATER TRANSPORTATION FROM WELLS LINE LC-14 TO THE RIVERBED OF DUNAVAC ON THE WEST SIDE OF OPEN PIT DRMNO

  • Tomislav Šubaranović Faculty of Mining and Geology, University of Belgrade, Serbia
  • Nikoleta Mikušová Institute of Logistics, Faculty BERG, Košice, Slovakia

Abstract

Transport is an integral part of mining activities. In addition to driving, mining, processing, and dispatching, transport presents the most important service process in deep and open-cast mines. This paper presents the solution of the water transport from the wells line LC-14 by pipeline. It is envisaged that the pipeline is placed on the surface of the terrain, and partly the transport of water will take place under pressure, and the other part gravitational.

Published
2018-12-29
Section
Transport & Logistics